Printing Company
The addition to the local plant of a national printing company consisted of a high bay steel-braced frame, and included a waste collection unit that protruded through the roof, and a new depressed loading dock. The loading dock ramp was heated with a hydronic system to reduce ice and snow accumulation.
Intelligencer Printing Company
Additions to Intelligencer Printing Company consisted of a new high bay warehouse adjacent to the existing pre-engineered building. Due to the higher roof elevation of the addition, the existing roof required a snow melt system and reinforcing to accommodate a new snow drift load.