Milton Sewage Treatment Plant

Upgrade and expansion of the Sewage Treatment Plant for the Milton Sewer Authority involved structural design of nine buildings all within the flood plane of the Susquehanna River. Several of the buildings were designed for up to 20 feet of flood load. Zug & Associates, Ltd. designed reinforced concrete tanks, post-tensioned concrete tanks, pile foundations, the base for precast concrete tanks and miscellaneous other smaller structures.

City of Lancaster

City of Lancaster potable water tank involved the design of a reinforced concrete foundation for the three-million-gallon storage tank, preparation of the site, and preparation of specifications for the tank and its finish.

 